Electrical work between tenancies in Nottingham is worth doing when the job needs the power off, unrestricted access, or disruption a tenant living there would never accept: an EICR and whatever it flags, a consumer unit replacement, and — in an older property — a rewire. Everything else can usually be done with someone in the house, so it need not spend your void.
All of this work is for a qualified, registered electrician — Somo Electrical is NAPIT-registered, registration number 33320. Which parts must be notified to building control, and the certificates that follow, are for your electrician to confirm against the Building Regulations position on GOV.UK. Your landlord EICR duty is set out there and in our landlord EICR guide; this page is about cost and timing, not the duty.
Which electrical work between tenancies is worth doing in Nottingham?
These are Somo Electrical's own ranges for a Nottingham rental — not quotes, not national averages. The only way to price a job is to look at the property.
| Job | Somo's range | Time on site | What an empty property changes |
|---|---|---|---|
| EICR on a rental property | £170 – £250 | 2 – 4 hours | No appointment to negotiate, and power off in blocks without anyone minding |
| Consumer unit replacement | £600 – £1,000 | About half a day | Supply off for most of it — the hardest job to do around an occupied house |
| Remedial work after an EICR | Priced from the report | Depends entirely on the findings | Several circuits in one visit instead of three part-day appointments |
| Full rewire, 3-bed semi | £4,000 – £6,000 | 5 – 7 working days, plus plastering and decorating | Only realistic with the property empty |
| Extra sockets, lighting changes | Priced on survey | Varies with the route | Chasing walls and lifting floors becomes a decorating job either way |
Remedial work is the one line nobody can price in advance, us included: until the inspection happens there is no list of items to quote against. Our guide to what EICR remedial work costs explains what moves it.
What does an empty property actually save you?
Three things, only one of them money off the invoice.
- Access, the big one. An electrician who never waits for someone to get home, move furniture or agree to the power going off gets more done per day. Across several circuits that is the difference between one visit and three.
- No negotiation, and mess stops mattering. Notice and appointment windows disappear, and chased plaster matters far less in a property being redecorated anyway.
It does not cut the hourly cost — a board swap is the same labour either way. What changes is how many days of lost rent you pay for, so work that sum against your own weekly rent, not a published average.
Which jobs really need the property empty?
- A rewire, genuinely. Five to seven working days on a 3-bed semi, floors up and walls chased, then plastering and decorating behind it. Nobody lives through that.
- A consumer unit replacement, in practice. About half a day with the supply off for most of it — possible with tenants in, awkward enough that a void is the obvious slot.
- Remedial work on several circuits. Possible occupied, but much slower.
An EICR itself does not need an empty house: two to four hours, power off in short spells, report usually within one to two working days. It is simply easier empty. If you are weighing a new board against a rewire, our guide to whether you need a new consumer unit or a full rewire covers that call.
How should the work be sequenced in a short void?
In order — getting this backwards turns a two-week void into a five-week one.
- Book the EICR for the first day the property is empty, not the last — everything else depends on what it says.
- Get the report, then the remedial work quoted against it — priced line by line, not as a lump sum.
- Decide then whether the bigger job is now or later. If the report points at a rewire, decide in the first few days, while there is still void left to use.
- Put cosmetic work last — extra sockets, light fittings, outside lighting. Easiest to drop if the schedule tightens.
Check any electrician's registration yourself on the NAPIT or NICEIC register rather than taking a logo at face value. And if the report comes back unsatisfactory, the deadline for putting it right does not pause because your void ended — take that deadline from GOV.UK or our guide to the EICR codes.
What is worth leaving until the next changeover?
Plenty, and leaving it is not cutting corners. C3 items are improvement recommendations rather than failures, so they can go to the next void. Cosmetic work can wait indefinitely, as can anything that only makes sense alongside building work you have not yet decided on.
What should not wait is anything the report codes as a danger. A C1 or C2 is not a scheduling question, and a Friday move-in is not a reason to let it stand.
Frequently asked questions
Is electrical work actually cheaper between tenancies?
The labour and materials are the same. What an empty property saves is time — fewer visits, no waiting for access, no working around a household — and on multi-circuit remedial work that can genuinely reduce the bill. The bigger saving is usually your own schedule rather than the invoice: the job finishes in days instead of weeks.
How long should a landlord allow for electrical work in a void?
For an EICR and minor remedials, allow a few days: two to four hours on site, one to two working days for the report, then the remedial visit. For a consumer unit replacement, about half a day. For a full rewire on a 3-bed semi, five to seven working days of electrical work plus plastering and decorating behind it.
Can a consumer unit be replaced while tenants are living in the property?
Yes, and it often is. It takes roughly half a day with the supply off for most of that, so it needs agreeing with the tenant in advance and suits a household that is out during the day. A void simply removes the negotiation, which is why most landlords book it into the changeover if one is coming.
What happens if the EICR finds something major and the new tenancy starts in a week?
Anything coded as a danger is made safe or put right first, whatever the move-in date. Larger work can sometimes be staged so the property is safe now and the rest follows, but whether that works depends on the findings. Ask for the report and the remedial quote together so you can see the options.
Can I book electrical work before the tenant has moved out?
You can book it, and booking early is how you avoid losing the first week of the void to a diary. The work itself still needs either the property empty or the tenant's agreement to access and to the power being off. Confirming the date before the tenancy ends is the single easiest way to shorten a void.
Planning void electrical work with Somo Electrical
Somo Electrical is a NAPIT-registered electrical contractor, registration number 33320, working across Nottingham including Wollaton. We inspect and price rental properties between tenancies, and will say plainly when something can wait for the next changeover.
Call 07733 666004 or use our online quote form to book a changeover in. We cover landlord electrical safety certificates, consumer unit replacements and rewiring. See also EICR costs by property size, or what an EICR costs a letting agent across a portfolio.
Written 27 October 2026. Prices are Somo Electrical's own ranges, confirmed by the business owner on 11 August 2026, and are not quotes — only a look at the property can price a job. Remedial work and socket or lighting changes are deliberately unpriced: neither can be costed before an inspection. Durations are our own figures. No legal duty, inspection interval, remedial deadline, penalty figure or notification requirement is stated above — no primary source could be reached from the environment this was drafted in, so each is routed to GOV.UK and to your electrician. Inspecting and altering fixed wiring is work for a registered electrician.
Need Help With This?
Our NAPIT registered electricians are ready to help. Get a free, no-obligation quote today.