The commercial lease electrical checks to make in Nottingham before you sign are documentary and visual rather than hands-on: ask for the most recent condition report and the certificates covering any past alterations, confirm the existing supply and circuits suit what you actually intend to do in the unit, and establish who controls access to the intake and the distribution board. Once the lease is signed you have inherited whatever is there, and your leverage to get those questions answered is at its highest before that point.
Two terms first. An EICR — an Electrical Installation Condition Report — is the inspection and test of a building's fixed wiring, and it is the single most useful document you can ask for. A distribution board is the commercial equivalent of a domestic consumer unit, the enclosure holding the circuit protection for the unit. Nothing below involves opening either one: this is paperwork, a walk-round with a torch, and a list of questions for the agent.
The pre-signing electrical checklist
Work through it in this order. Every step is something you can do yourself before you commit, and the last step is where it stops.
- Ask for the most recent EICR for the unit. Note three things from the front page: the inspection date, the date recommended for the next inspection, and whether the overall outcome is satisfactory or unsatisfactory.
- Ask what happened to anything coded on it. An unsatisfactory report that has been put right and certified is a very different proposition from one that was filed and forgotten. Ask for the evidence, not the assurance.
- Ask for the certificates covering alterations. A fit-out, air conditioning, electric shutters, catering equipment, new lighting or a chargepoint should each have left an Electrical Installation Certificate or a Minor Electrical Installation Works Certificate behind it.
- Ask for the life-safety records — emergency lighting and the fire alarm. The logbook tells you quickly whether the building has been looked after.
- Ask who holds the paperwork for the shared parts. In a building in multiple occupation, the landlord's supply, the risers and the common areas are usually certificated separately from your demise, and often by someone else entirely.
- Establish how the unit is metered. Your own meter and supply contract, or a landlord sub-meter with the electricity recharged to you? If the supply is your own, ask for the MPAN — the supply number on the bill.
- Write down what you intend to do in the unit, and mark the electrical parts of it. That list is what your electrician needs, and it is the one thing the agent cannot tell you.
- Walk round and look, using the list further down.
- Find out who can physically get to the board, and who holds the key if it sits outside your demise.
- Stop there. Do not open a distribution board, remove a cover, operate switchgear or test anything. If a question needs more than looking at, that is the point to get a qualified, registered electrician in — with the landlord's permission, and before you commit rather than after.
What can you tell from the paperwork the agent sends over?
More than most people expect, and the dates do most of the work. A report dated last year on a unit nobody has altered since is reassuring. One dated eight years ago, on a unit that has had two tenants and a refit since, tells you the installation has changed and the paperwork has not kept up.
How often a commercial installation should be reinspected is a separate question, covered in how often a commercial property needs an EICR. The authority on electrical safety duties at work is the Health and Safety Executive at hse.gov.uk — work from that rather than any contractor's published table, ours included.
A missing document is information too, not a dealbreaker — plenty of sound small units have patchy records. What it changes is the order of events: if nobody can produce a condition report, have one done before you sign rather than discover its contents in your second month of trading.
Will the existing supply handle what you intend to do in the unit?
This is the check that gets skipped, and it is the expensive one: an installation can be in sound condition and still be the wrong size for a new occupier, because capacity is about what you are going to plug in rather than about what is wrong. The jump is usually a change of use. A clothes shop becoming a coffee shop gains a commercial kitchen; a salon gains washpoints and heat; a gym gains machines, a workshop fixed plant, an office comms and air conditioning. Vehicle charging is its own exercise — see commercial EV charger costs in Nottingham. Each adds load, and some add circuits the unit does not have.
Whether the incoming supply and the existing board have room for it is a question for your electrician, working from your list. Where the supply itself needs changing, the distribution network operator is involved too — the company that owns the cables in the street, not the supplier who bills you — and its lead time runs to weeks, which matters if a fit-out date is already agreed. Supply alteration, metering and switchgear are not DIY in any form.
What can you see on a walk-round without touching anything?
Quite a lot, and all of it visual. Take a torch and keep your hands in your pockets.
- Where the board is. Inside your unit, or in a shared cupboard, riser or cellar you may have no right of access to.
- What kind of board it is. A modern enclosure with labelled circuit breakers, an older board with rewireable fuses, or several boards of different ages bolted up together — which usually means the installation has grown in stages.
- Sockets — how many, and where. A back counter running on a chain of extension leads is a sign of too few sockets, not a solution to it. Note the circuit labelling too, or the lack of it.
- Heat and damage. Scorch marks, discoloured or cracked faceplates, anything warm to stand near.
- Surface cable and conduit, especially in a back room, cellar or yard, and any sign of damp where it passes outside. Many city centre units are converted Victorian buildings with a cellar, and damp plus electrics is worth noticing early.
- Lighting and emergency lighting. What type, what age, and — in a unit the public walks into — whether there are emergency lighting heads at all. Our guide to emergency lighting testing requirements covers what they commit you to.
- The outside. External sockets, yard lighting, shutter motors, illuminated signage. Outdoor circuits age faster than indoor ones and show water damage first.
Write down anything that looks wrong and pass the list on. Do not test it, reset it or open it. If you can smell burning, see scorching or see an exposed conductor, keep people away from it and say so to the agent in writing straight away.
Who can get to the distribution board once you are the tenant?
Worth settling in writing now rather than at eight o'clock on a trading morning. Many Nottingham city centre and high-street units have their own board inside the demise plus an intake and metering position in a shared cupboard held by the landlord or managing agent — sometimes reached through another tenant's space. If that is the arrangement, your electrician needs the agent's co-operation, so ask who holds the key and how they are reached out of hours. Power that keeps tripping in a shop or office covers what that means when something actually trips.
Where the electrical questions stop and the lease questions start
At the point of who pays. An electrician can tell you the condition of the installation, what it will support and what it would cost to bring it where you need it. Who carries that cost between you and the landlord is decided by the lease — the repairing covenants, the alterations clause, any schedule of condition — and belongs with your solicitor or surveyor, as what your policy requires belongs with your broker. An electrical report does not answer it. So the sequence is the point: get the electrical facts first, in writing, while they are still negotiable.
Frequently asked questions
Do I need an EICR before I sign a commercial lease in Nottingham?
No rule says a tenant must obtain one before signing. It is a commercial judgement: a condition report is the only way to know what you are taking on, and findings are far easier to act on before signature than after. If the landlord can produce a recent satisfactory report with its remedial work certified, that may be enough.
What if the unit has no electrical certificates at all?
Treat it as a gap to price rather than a reason to walk away. Plenty of long-held small units have no paperwork because nobody ever asked for any. It does mean nothing is known about the installation, so commission a condition report before you commit, with the landlord's permission to carry it out.
Can I get an electrical inspection done before the lease is signed?
Usually yes, with the landlord's or agent's consent — it is their building until signature, so access is arranged rather than assumed. Ask early, because it needs a date in the diary and the power off in parts of the unit. Agents see the request regularly on commercial lettings.
Does changing the use of a unit mean the electrics need upgrading?
Not automatically, but it is the commonest reason an upgrade turns out to be needed. A change of use adds load and often new circuits — catering, washpoints, plant, charging — and the installation was sized for the last occupier. The answer comes from an electrician reading your list of intended equipment against the actual supply and board.
Pre-lease electrical checks for Nottingham business premises
Somo Electrical is a NAPIT-registered electrical contractor, registration number 33320, working for businesses across Nottingham — from city centre units to high-street and trade premises in Long Eaton. We will inspect a unit before you commit to it, say plainly what it will support, and quote the work to get it where your business needs it. Call 07733 666004 to arrange an inspection and test or to talk through a commercial fit-out, or use our online quote form.
Written 13 November 2026. No inspection interval, statutory duty or liability position is stated here: no primary source could be opened from the environment this was drafted in, so electrical safety duties at work are routed to the Health and Safety Executive at hse.gov.uk and to our commercial EICR guide, and everything about who pays is routed to the lease and your own adviser. Inspecting, testing and altering fixed wiring, supplies and switchgear is work for a qualified, registered electrician.
Need Help With This?
Our NAPIT registered electricians are ready to help. Get a free, no-obligation quote today.